Shaanxi Gear Co., Ltd. is a manufacturer engaged in various production and processing of automobiles, engineering machinery, gears, bearings, mechanical equipment installation and manufacturing. Due to the limited space in the existing factory, it affects the sustainable development of the manufacturer. In order to expand production scale, the company has hired a logistics company to help complete the relocation of the entire factory.
After careful statistics and inventory, it was found that more than 500 equipment in the factory need to be relocated, with punching machines and grinding machines accounting for the majority. In addition, there are also mechanical components weighing multiple tons. The logistics company's main tasks include equipment and logistics relocation, lifting, loading, transportation, unloading and positioning. As the entire construction period is only 9 days, the logistics company has made professional and detailed relocation arrangements for this purpose.
1. In response to the narrow passage at the entrance of the factory building, limited working environment, and difficulties in the entry and exit of large cranes and trucks, it has been decided to use manual hydraulic handling vehicles to move small equipment to the entrance of the factory building, in order to accelerate the construction schedule as much as possible while protecting the equipment intact.
2. Different relocation and shipping methods have been adopted to address the complex relocation objects in the factory building.
3. In response to the tight schedule, a large amount of manpower and material resources have been dispatched to carry out the relocation work.
Finally, with detailed arrangements and rapid implementation by the logistics company, the relocation of the entire factory was completed within the specified time frame, earning high praise from the customer.